One recent Grocery client needed a facility had to be designed on an existing site with a 13,000-pallet racking layout before a structural system was selected, cold storage requirements built in from the start, and a budget held through a multi-year delivery on a project type their organization had not built before.
Challenge: Every structural decision depended on what the building had to hold. The racking layout, the refrigeration system, and the floor load requirements all had to drive the engineering before the engineering began.
Solution: Pencor was engaged before the structural drawings were started. We designed the building around the operation, managed the full scope from preconstruction through delivery, and established a budget before engineering began.
Result: The budget held without a single change for over two years from initial pricing. The project was delivered ahead of schedule.