Being clear about limits is part of using a conceptual estimate well. The number is built before the design exists, so it cannot account for every detail the drawings will add later. Finish selections, mechanical choices, and hidden site surprises are still unknown at this stage. Cost professionals call the earliest level of estimate a Class 5 cost estimate, and it rests on the least project information of any level. That is why a good estimate names its assumptions.
A conceptual estimate works best when the scope stays steady. If the size, use, or finish level changes, the figure should change with it, and those decisions need to flow back into the number. Confirming site conditions and using current local pricing gives the figure more to stand on than a generic template. Pencor updates the estimate as the design develops, so the number stays tied to the drawings. Each later stage adds detail on top of that first foundation.